Case Study - Replacing Work Surfaces

A new work surface can completely change how your kitchen looks, feels, and works — without starting from scratch

Designed and selected in your home, work surface upgrades are one of the most effective ways to personalise a kitchen

Replacing Dark Granite

Replacing the oppressively dark granite work surfaces with bright and subtly-veined quartz was a straightforward way to transform this space

A luxurious undermount ceramic sink finished the bright and fresh look

Black Granite Work Surfaces

What Are The Steps

  1. Removal of Your Existing Work Surfaces

  2. Laser Templating In Your Home

  3. Fabrication At The Factory

  4. Installation In One Day

1. Removal Of Your Existing Work Surfaces

The existing work surfaces are removed prior to templating. The sink is disconnected and removed

The old surfaces are loosened and removed in manageable sections - taking great care not to damage the surrounding structures and finishes

Accurate templating (and therefore, final fit of the new surfaces) is based on the final, fixed positions of cabinets, sinks and appliances

There is typically a lead-time of 10 working days between booking and the templating appointment, and a further 10 working days from templating to installation

2. Laser Templating in Your Home

A laser measuring instrument is used to build up a very accurate plan of the new work surfaces

The software models the widths, lengths, angles, curves and radii of all the sections with sub-millimetre accuracy

The computer model is reviewed with the client and signed off as complete and accurate, including the chosen material, pattern and colourway

There is typically a lead-time of 10 working days between templating and installation

3. Fabrication At The Factory

The software template is sent directly to the fabricator for submission into production

The various sections are cut by state-of-the-art machinery in their facility within the UK

All required curves, profiles, holes and apertures are cut by machines

4. Installation in One Day

On the day of installation, the kitchen will have been prepared for the new work surfaces

All cabinets, undermount sinks and appliances will have been set into their final positions

Your new work surfaces will be installed in sections, fixed down with epoxy adhesive, and silicone sealed to adjacent surfaces, as necessary

There’s no cutting, noise or dust

Any temporary taps will be removed and the permanent tap fitted

Finally, the tap and waste will be re-connected

Your home will be left spotlessly clean - no dust and no mess